The reconstruction of the checkpoint is carried out according to the order of the Federal Agency for the Construction of the State Border of the Russian Federation (Rosgranitsa) No. 337-OD dated December 28, 2015 “On the reconstruction of the sea cargo-passenger permanent multilateral border crossing checkpoint on the state border of the Russian Federation in the sea port – the Passenger Port of Saint-Petersburg”.
To establish a year-round ferry service using the infrastructure of the sea terminal and the border crossing checkpoint for the implementation of operations involving the reception of freight vehicles transported by ferries, a set of measures is being implemented to reconstruct the checkpoint in the sea port. In Q1 2018, a positive opinion of the State Expertise Board for the design and estimate documents has been obtained. Currently, an agreement is expected to be signed on the development of the land plot, after which the construction and installation works will be carried out at the site. The total duration of the reconstruction is 12 months.
The project is expected to be implemented as part of the Cross-Border Cooperation Program “Russia – Southeast Finland” 2014–2020. In 2018, the project application for the grant of the Program is under consideration in the European Commission.
Considering the tendency to increase the capacity of cruise ships and their size, PP SPb MF, JSC began the work on designing offshore dolphins at the berth No. 7. The implementation of the Project provides for the reconstruction of the berth No. 7 by building three offshore dolphins with connecting bridges and increasing the length of berths No.No 6 and 7 (the berth front) by 108.6 meters.
The developed design documents provide for step-by-step performance of works on the reconstruction of berth No. 7 of the Port:
Stage 1: construction of the dolphin No. 1.
Stage 2: construction of the dolphin No.No. 2 and 3 with dredging works.
At the end of Stage 1, the existing length of berth No. 7 will increase by 41.6 meters to be 416.6 meters. The total length of the berth front (704.6 long meters) will provide for simultaneous calls of two ships: a 294.0-meter-long one (to the berth No. 6) and a 333.3-meter-long (to the berth No. 7).
The execution of Stage 2 works provides for additional extension of the berth No. 7 by 67.0 meters. At the end of Stage 2, the length of the berth No. 7 will be 483.6 meters. The total length of the berth front (771.6 long meters) will provide for simultaneous berthing two 333.3-meter-long ships at berths No. No. 6 and 7. The extension of the front line of the berth No. 7 entails dredging of the Port’s water area within the work scope of 2.63 hectares. In accordance with the construction management project, dredging work shall precede the start of the construction of dolphins No. No. 2 and 3.
Establishing the Sea Passenger Shipping Company
Under the approved Plan of Production, Financial and Economic Activities for the Period of 2017–2021, in fulfillment of instructions of the President of the Russian Federation, according to the results of the meeting of the Presidium of the State Council on the Development of Inbound Tourism on August 17, 2015, PP SPb MF, PLC is implementing the project to establish the Sea Passenger Shipping Company in Saint Petersburg.
G.S. Poltavchenko, the Governor of Saint Petersburg, addressed to the President of the Russian Federation V.V. Putin with a request for assistance in the detailed elaboration of this initiative. According to the instruction of the President of the Russian Federation, the Government of St. Petersburg sent to the Government of the Russian Federation a business plan developed by PP SPb MF, PLC for establishing the Sea Passenger Shipping Company in Saint Petersburg.
On February 21, 2018, the meeting headed by V.A. Olersky, the Deputy Minister of Transport of the Russian Federation – the Head of the Federal Agency for Marine and River Transport, with representatives of interested ministries and agencies of the Government of the Russian Federation, supported the plan to establish the Sea Passenger Shipping Company in Saint Petersburg.
At present, the development of the project concept is being finalized for its further practical implementation. Establishing the Sea Passenger Shipping Company will contribute to the development of Saint Petersburg as one of the most attractive tourist destinations in the world, and it will increase the cruise passenger traffic, including due to the fact that trips through the Baltic and the North Seas will be more accessible for citizens of the Russian Federation.
Project for the Construction of a Sports and Fitness Center
Today, as part of expanding the list of services offered and social activities, PP SPb MF, PLC is implementing the construction project of a multifunctional sports center, the creation of which will allow active participation in joint training sessions, friendly matches, and other tournaments in various sports for the Port’s employees, crew members of arriving ships, and residents of the Vasilievsky Island.
The total area of the facility will be 933.8 sq.m. The view of the sports center is presented in the drawings.